• Home
  • Stormwater Management
  • Stage 5: Completed project by covering with a thin layer of soil, and grass seed, which generates an aesthetically pleasing permeable surface for water to make its way into the storage reservoir.
    Tuesday, March 22 2011 @ 07:37 PM EDT
    0 Comments
    Views 2656
    Currently 0.00 / 5 (0 votes)
  • Stage 2: Line the walls and catchment with weed suppressant. Stage 3: Place perforated 8" PVC piping in the centre of the hole, to allow an area for a pump to enter the cistern. Stage 4: Fill the hole with 3/4" crushed gravel; this creates a
    Tuesday, March 22 2011 @ 05:29 PM EDT
    0 Comments
    Views 2790
    Currently 0.00 / 5 (0 votes)
  • Stage 1, continued
    Tuesday, March 22 2011 @ 04:50 PM EDT
    0 Comments
    Views 2765
    Currently 0.00 / 5 (0 votes)
  • Stage 1, continued
    Tuesday, March 22 2011 @ 04:42 PM EDT
    0 Comments
    Views 2761
    Currently 0.00 / 5 (0 votes)
  • Stage 1: Dig 2-tiered hole to ensure maximized water capture
    Tuesday, March 22 2011 @ 02:17 PM EDT
    0 Comments
    Views 2693
    Currently 0.00 / 5 (0 votes)
Jump to
Album ID: 11 
Sort By